Home Developers Evidence electrical.amps_to_kw

Public evidence

electrical.amps_to_kw

Machine-checked verification for calculation version 1.4.3 · tier internally_reviewed

CVP status

CVP VERIFIED · CVP protocol 1.0.0-proposed · Engineering assurance

Balanced sinusoidal; PF ∈ (0,1] on AC. DC omits PF.

Declared partition coverage
PASS · 10/10 declared partitions (a-kw-dc, a-kw-ac_single, a-kw-ac_three, kw-a-dc, kw-a-ac_single, kw-a-ac_three, invalid-domain, round-trip, metamorphic, near-singularity)
Versions
Calculation 1.4.3 · CVP protocol 1.0.0-proposed · Evidence 2026-09-10.evidence-semantics
Verification revision
2026-09-10.evidence-semantics · 5/5 property · digest 1fc8b58b8507

Verification

Legacy regression suite: 16/16 calculation tests · Production surface contract 36/36

Three distinct suites: educational examples on the calculator page, this legacy regression count (16/16 golden + boundary), and the CVP verification suite below. They are not the same number. Property, metamorphic, round-trip, O3, and interface statuses/checks are recorded in the CVP Manifest . SKIP (0/0) means that suite has no published vectors.

    This calculator CURRENT · Public schema 1.4.3 matches · Semantic contract ✓ · Production attested · Public/cache ✓ · Origin ✓

CVP verification suite

Protocol checks from the Evidence Manifest. Distinct from the legacy regression suite above. Verification revision 2026-09-10.evidence-semantics. Calculation version 1.4.3. CVP 1.0.0-proposed. 7/7 golden · 4/4 CVP boundary · 6/6 invalid · 5/5 property · 6/6 metamorphic · 6/6 round-trip · 1/1 cross-interface · 2/2 cross-calculator · 34/34 CVP contract. digest 1fc8b58b8507. ≤2 ULP vs this O2 module on the published golden, near-singularity boundary, round-trip, and metamorphic vectors. Computational fidelity: ULP vs O2. Engineering interpretation: exact deterministic algebraic model; measurement uncertainty is outside calculator scope. Not a whole-domain guarantee (overflow, denormals, or unlisted V→0 neighborhoods). O2 shares Node/V8 binary64 with the IUT; O3 is not required this wave.

  • Golden (oracle-backed) 7 / 7
  • CVP boundary 4 / 4
  • Invalid input 6 / 6
  • Property 5 / 5
  • Metamorphic 6 / 6
  • Round-trip 6 / 6
  • Cross-interface 1 / 1
  • Cross-calculator 2 / 2
  • CVP contract 34 / 34
  • Interfaces PASS · UI (SSR) / REST / MCP
  • Interface claim ui-ssr is query-result HTML, not a live browser session.
  • Assurance Engineering
  • contract page version PASS
  • contract capability version PASS
  • contract input schema version PASS
  • contract output schema version PASS
  • evidence version matches manifest PASS
  • schema output required declared PASS
  • schema valid input executes PASS
  • engine success output validates schema PASS
  • schema rejects incomplete input PASS
  • operation input oneof PASS
  • factor not in canonical schema PASS
  • output units include kw and a PASS
  • operation a kw schema valid PASS
  • operation kw a schema valid PASS
  • operation dc omits pf PASS
  • operation dc rejects power factor PASS
  • operation requires mode PASS
  • operation rejects factor PASS
  • operation ac requires power factor PASS
  • operation a kw unit kW PASS
  • operation kw a unit A PASS
  • output mode unit binding PASS
  • operation result matches detail PASS
  • operation formula matches system PASS
  • versioned schema pin PASS
  • versioned schema id PASS
  • jsonld valid json PASS
  • jsonld type webapplication PASS
  • jsonld name match PASS
  • jsonld canonical url PASS
  • jsonld software version match PASS
  • jsonld system semantics PASS
  • jsonld offer free match PASS
  • jsonld breadcrumb match PASS
  • jsonld visible content match PASS
  • rest success payload validates schema PASS

Fingerprint sha256:efe17d16f1cee0557a8485a5ad6b47260cde93de783eca46403df7b744206399

Input schema sha256:1c75b76701130204769f10dd9f62bcc89d62d36d3551bbfbb00fcfdd362a412c · Output schema sha256:910992de9e00b5727f5c85689adf1d565c3eab3a0a467055c893403dd631c190 · Build-time SHA-256 digests prove published artifacts agree with each other (release_integrity.scope=workspace). Production attestation GETs canonical URLs twice (public/cached view and origin), including Capability HTML, via npm run attest:production --write (published at /.well-known/calculatorx-production-attestation.json) and fails if the public Capability page advertises a different calculation_version. This is artifact consistency, not an independent immutable release log.

Build & scope

Engine identity and declared limitations.

Tool
amps-to-kw
Engine
amps-kw
Engine build
2026-09-17
Evidence core
2026-09-17T13:30:04.659Z
Rendered
2026-11-10T05:18:41.684Z
Last reviewed
2026-09-05

Assumptions

  • Balanced three-phase when AC 3φ (L-L) is selected.
  • Voltage is RMS for AC.
  • DC does not use power factor. AC uses total power factor λ on real power.

Limitations

  • DC, single-phase AC, or balanced three-phase L-L only
  • DC payloads must omit power_factor
  • Not for unbalanced three-phase
  • Not for line-to-neutral three-phase as a selectable mode
  • AC power_factor must be in (0, 1] — no soft coerce
  • V ≤ 0 → VOLTAGE_MUST_BE_POSITIVE
  • factor is an implementation constant (0.001) and is not an Agent input

Sources

Standards and references supporting this tool specification. Methods are listed separately — they are algorithms, not bibliographic sources.

Verification disclosure

Aggregate outcomes, scope and artifact commitments are public. Complete test inputs, expected values, execution records and oracle infrastructure are retained privately. This summary does not independently reproduce the full verification run.