Home Developers Evidence engineering.process.guard_band

Public evidence

engineering.process.guard_band

Machine-checked verification for calculation version 1.0.0 · tier engine_tested

CVP status

CVP VERIFIED · CVP protocol 1.0.0-proposed · Engineering assurance · Simple guard band GB=k·u (k default 2) and optional A_USL/A_LSL + O3 mpmath tabulated GB.

Simple k·u band. Not ILAC G8 risk. O3 tabulated vectors only.

Declared partition coverage
PASS · 6/6 declared partitions (default-k, explicit-k, two-sided, usl-only, lsl-only, invalid-domain)
Versions
Calculation 1.0.0 · CVP protocol 1.0.0-proposed · Evidence 2026-09-16.o2-o3
Verification revision
2026-09-16.o2-o3 · 3/3 property · digest f0b6360d0f41

Verification

Legacy regression suite: 6/6 calculation tests · Production surface contract 6/6

Three distinct suites: educational examples on the calculator page, this legacy regression count (6/6 golden + boundary), and the CVP verification suite below. They are not the same number. Property, metamorphic, round-trip, O3, and interface statuses/checks are recorded in the CVP Manifest . SKIP (0/0) means that suite has no published vectors.

    This calculator CURRENT · Public schema 1.0.0 matches · Semantic contract ✓ · Production attested · Public/cache ✓ · Origin ✓

CVP verification suite

Protocol checks from the Evidence Manifest. Distinct from the legacy regression suite above. Verification revision 2026-09-16.o2-o3. Calculation version 1.0.0. CVP 1.0.0-proposed. 5/5 golden · 3/3 CVP boundary · 6/6 invalid · 3/3 property · 2/2 metamorphic · 8/8 O3 · 4/4 cross-interface · 4/4 CVP contract. digest f0b6360d0f41. O2: GB=k·u and optional acceptance limits vs separate-module identities (≤2 ULP). Not ILAC G8 risk, not Cp/Cpk, not Monte Carlo. ≤2 ULP vs O3 applies only to the published tabulated GB vectors (default k, explicit k, two-sided, USL-only, LSL-only, u=0). It is not a whole-domain guarantee and does not cover ILAC G8 risk or Cp/Cpk.

  • Golden (oracle-backed) 5 / 5
  • CVP boundary 3 / 3
  • Invalid input 6 / 6
  • Property 3 / 3
  • Metamorphic 2 / 2
  • O3 high-precision 8 / 8
  • Cross-interface 4 / 4
  • CVP contract 4 / 4
  • Interfaces PASS · UI (SSR) / REST / MCP
  • Interface claim ui-ssr is query-result HTML, not a live browser session. Error-path engine·REST·MCP 1/1 (status, code, calculation_version). SSR compared on URL-canonical requested calculations; empty query is idle (not an error) and JSON-typed object/array inputs are REST/MCP-only.
  • Verified scope Simple guard band GB=k·u (k default 2) and optional A_USL/A_LSL + O3 mpmath tabulated GB.
  • Assurance Engineering
  • Deferred Not ILAC G8 / JCGM 106 consumer-producer risk tables, not Cp/Cpk, not Monte Carlo, and not a standalone Combined/Expanded page.
  • release artifacts aligned PASS
  • schema output required declared PASS
  • schema valid input executes PASS
  • engine success output validates schema PASS
  • schema rejects incomplete input PASS
  • rest success payload validates schema PASS

Fingerprint sha256:627fa63547b70bd89e84e6f4a2ae64a4b4dc7fff3f9b3f3a97a08fae1d502165

Input schema sha256:016985412089204a0464c005ecf8a90ab1f7340907f5e294be02e2fd7209d30b · Output schema sha256:727853f8a26875295a768f3fbe8b1edcfbe471c65d73674a6453d9d1d510d7f6 · Build-time SHA-256 digests prove published artifacts agree with each other (release_integrity.scope=workspace). Production attestation GETs canonical URLs twice (public/cached view and origin), including Capability HTML, via npm run attest:production --write (published at /.well-known/calculatorx-production-attestation.json) and fails if the public Capability page advertises a different calculation_version. This is artifact consistency, not an independent immutable release log.

Build & scope

Engine identity and declared limitations.

Tool
guard-band
Engine
guard-band
Engine build
2026-09-16
Evidence core
2026-09-16T05:06:07.111Z
Rendered
2026-11-10T05:18:41.777Z
Last reviewed
—

Assumptions

  • GB = k·u with k default 2
  • Not ILAC G8 / JCGM 106 risk-based decision rules
  • USL and LSL optional; omitted limits skip that acceptance output
  • Not Cp/Cpk and not Monte Carlo

Limitations

  • GB = k·u with k default 2 — not ILAC G8 / JCGM 106 risk-based rules
  • USL and LSL optional; omitted limits skip that acceptance output
  • Not Cp/Cpk and not Monte Carlo

Sources

Standards and references supporting this tool specification. Methods are listed separately — they are algorithms, not bibliographic sources.

Verification disclosure

Aggregate outcomes, scope and artifact commitments are public. Complete test inputs, expected values, execution records and oracle infrastructure are retained privately. This summary does not independently reproduce the full verification run.